20 hours ago

  • ZONING PERMIT

    FOR THE LOT ADJUSTMENT TO CREATE ONE (1) LOT FROM TWO (2) LOTS (806 W NORRIS ST AND 808 W NORRIS ST). SIZE AND LOCATION AS SHOWN ON PLANS AND APPLICATION. FOR THE ERECTION OF AN ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN ON PLANS AND APPLICATION. FOR USE AS MULTI-FAMILY HOUSEHOLD LIVING FIVE (5) FAMILY DWELLINGS).

    806 W NORRIS ST Issued April 17, 2018 Comment
  • ZONING PERMIT

    FOR THE LOT ADJUSTMENT TO CREATE ONE (1) LOT FROM TWO (2) LOTS (806 W NORRIS ST AND 808 W NORRIS ST). SIZE AND LOCATION AS SHOWN ON PLANS AND APPLICATION. SEE A/P NO 865336 FOR PLANS. FOR THE ERECTION OF AN ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN ON PLANS AND APPLICATION. FOR USE AS MULTI-FAMILY HOUSEHOLD LIVING FIVE (5) FAMILY DWELLINGS).

    808 W NORRIS ST Issued April 17, 2018 Comment

20 hours ago

44 hours ago

  • PLUMBING PERMIT

    EZ PLUMBING PERMIT - HOUSE TRAP AND FRESH AIR INLET REPLACEMENT - "ALL EXCAVATIONS AND PLUMBING TRENCHES IN EXCESS OF 5'IN DEPTH MUST HAVE APPROVED SHORING IN PLACE AT THE TIME OF INSPECTION"AS PER 2004 PHILA. PLUMBING CODE OPENING PERMIT 201804318.

    2002 N DARIEN ST Issued April 16, 2018 Comment

44 hours ago

2 days ago

4 days ago

6 days ago

6 days ago

6 days ago

Apr 12

Apr 12

Apr 12

  • PLUMBING PERMIT

    NEW CONSTRUCTION: EXTERIOR PLUMBING; 3 STORY STRUCTURE; 3 DWELLING UNITS; 1-6" HOUSE TRAP WITH FAI; 1-4" AREA DRAIN, 1-3" RWC, 1-1" & 2-3/4" DOMESTIC WATER SERVICES TO 5' FROM BLDG - THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004

    2041 N 9TH ST Issued April 10, 2018 Comment
  • SUPPRESSION PERMIT

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- FOR THE RELOCATION OF SPRINKLER HEADS AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.

    2150 N 10TH ST Issued April 10, 2018 Comment
  • ALTERATION PERMIT

    EZ ALTERATIONS PERMIT - FOR ALTERATIONS TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS. WORK TO INCLUDE REPAIRS TO NON-LOAD BEARING PARTITION FRAMING, REPAIR GWB, TAPE AND FINISH THROUGHOUT, TRIM, INSULATION, KITCHEN & BATHROOM ALTERATIONS, REPAIR SUBFLOORS, HARDWOOD FLOORING, ENTRY DOOR, INTERIOR DOORS AND WINDOWS WITH NO CHANGE IN SIZE OR LOCATION, REPAIR ROOF. SEPARATE PERMITS REQUIRED FOR PLUMBING, ELECTRIC AND HVAC INSTALLATIONS. CALL INSPECTOR AT LEAST 24 HOURS PRIOR TO THE START OF WORK.

    2315 N FAWN ST Issued April 10, 2018 Comment
  • ALTERATION PERMIT

    EZ ALTERATIONS PERMIT - FOR ALTERATIONS TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS. WORK TO INCLUDE REPAIRS TO NON-LOAD BEARING PARTITION FRAMING, REPAIR GWB, TAPE AND FINISH THROUGHOUT, TRIM, INSULATION, KITCHEN & BATHROOM ALTERATIONS, REPAIR SUBFLOORS, HARDWOOD FLOORING, ENTRY DOOR, INTERIOR DOORS AND WINDOWS WITH NO CHANGE IN SIZE OR LOCATION, REPAIR TO REAR BAY, REPAIR ROOF. SEPARATE PERMITS REQUIRED FOR PLUMBING, ELECTRIC AND HVAC INSTALLATIONS. CALL INSPECTOR AT LEAST 24 HOURS PRIOR TO THE START OF WORK.

    2331 N FAWN ST Issued April 10, 2018 Comment

Apr 10

Apr 09

Temple neighbors balk at community center 'bribe' in football stadium feud

The 95,000-square-foot center would sit at 1301 Diamond street on a Temple-owned parking lot. The university’s students and faculty would partner with nonprofits to offer pre-K to 130 children, a dental clinic, autism screenings, workforce training, and a place to connect with other resources.

    Temple neighbors balk at community center 'bribe' in football stadium feud - Philly
    Temple University had a vision for a community center a few years ago, offering social services and prekindergarten classes to neighbors often at odds with the school's increasing development in North Philadelphia. The idea came from the School of Education's dean, newly hired in 2013 and eager to do something about the animosity he saw between town and gown.
    http://www.philly.com

Apr 09

  • Theft

    • Thefts

      1000 Block W. Nevada St. March 29, 2018 @ 9:51 p.m. Comment

Apr 08

Apr 07

Apr 07

Apr 06

Apr 05

North Philly residents oppose Temple’s proposed community center

The 95,000 square foot space would be on 1301 Diamond Street

...proposed 4-story, 95,000-square-foot development, dubbed, “The Alpha Center,” would sit at 1301 West Diamond Street—which is now a vacant lot—and feature a, “full service, interdisciplinary educational and community...

    Temple's community center proposal met with skepticism, anger
    Temple University recently unveiled their new proposal for a North Philly community engagement center, and it has some area residents more than a little skeptical. The proposed 4-story, 95,000-square-foot development, dubbed, "The Alpha Center," would sit at 1301 West Diamond Street-which is now a vacant lot-and feature a, "full service, interdisciplinary educational and community engagement center," according to the project proposal.
    https://philly.curbed.com

Apr 05

  • PLUMBING PERMIT

    INSTALL 1-6" HOSE TRAP WITH 4" FAI 1-4" AREA DRAIN 1-3" RWC AND 1-3/4" DOMESTIC WATER SERVICE TO 5' FROM BLDGU PA 1 CALL 2018-0672035

    2025 N DARIEN ST Issued April 3, 2018 Comment

Apr 05

SEPTA 5761 posted 5 photos to Flickr:

Apr 04

Apr 04

Mar 30

Mar 30

Mar 29

Philadelphia City Planning Commission added a...

Civic Design Review is an opportunity for major development projects to be reviewed in a public forum and be evaluated against consistent standards. For more information visit: http://www.phila.gov/CityPlanning/projectreviews/Pages/CivicDesignReview.aspx TENTATIVE AGENDA 1. 3900-46 Walnut Street, Amendment to the University of Pennsylvania Master Plan (previously heard at the March 6, 2018 CDR Meeting) Zoned: SP- INS, (Special Purpose - Institutional), Major Amendment to a Master Plan Gross Square Footage: 250,000 square feet Uses: 113 suites housing 450 students, 4 faculty apartments Accessory coffee bar, multipurpose room, kitchen and support Parking: 63 auto parking spaces at Walnut 40 Garage Developer: Trustees of the University of Pennsylvania Architect: Bohlin Cywinski Jackson PCPC Staff Presenter: Keith F. Davis 2. 702-714 Sansom Street (previously heard at the February 6, 2018 CDR Meeting) Zoned: CMX-5 (Commercial-Mixed-Use District) Gross Square Footage: 140,209 square feet on 24 floors (135,539 square feet residential, 4,670 square feet retail space) Uses: 85 residential dwelling units and one retail space Parking: 61 off-site auto parking spaces (within 1000 feet of site) Developer: Toll Washington Square LP Architect: SLCE Architects LLP Attorney: Ronald Patterson, Esq., Klehr Harrison Harvey Branzburg, LLP PCPC Staff Presenter: Jack Conviser 3. 1301 W. Diamond Street, Amendment to the Temple University Master Plan Zoned: RM1 & CMX-2 (Residential Multi-family, Commercial-Mixed Use) Proposed Revision to Temple University SP-INS Master Plan to include the parcel of land known as "1301 W. Diamond St." Gross Square Footage: 95,000 square feet Uses: Full service, interdisciplinary educational and community engagement center referred to as the "Alpha Center" Parking: Parking incorporated into existing Temple Univ. Master Plan Developer: Temple University Architect: Strada IIc Attorney: Neil Sklaroff, Esq. Ballard Spahr PCPC Staff Presenter: Keith F. Davis 4. 1102-48 North 2nd Street (previously heard at the February 6, 2018 CDR Meeting) Zoned: CMX-3 (Commercial-Mixed Use District) Gross Square Footage: 129,358 square feet, (116,652 square feet residential, 12,706 square feet commercial space) Uses: 84 dwelling units: 10 duplexes, one 17-unit multi-family dwelling, one 44-unit mixed-use building with one commercial unit, one 3-unit mixed-use building with one commercial unit Parking: 37 automobile parking spaces Developer: Streamline Philly Architect: Harman Deutsch Attorney: David Orphanides, Esq., Orphanides and Toner, LLP PCPC Staff Presenter: Sarah Richardsen 5. 1102-34 Germantown Avenue Zoned: CMX-3 (Commercial-Mixed-Use District) Gross Square Footage: 104,471 square feet (100,185 square feet residential, 4,286 square feet commercial space) Uses: 67 dwelling units: one duplex dwelling, one 6-family dwelling, five 7-family dwellings, one 24-unit mixed-use building with one commercial unit Parking: 21 automobile parking spaces Developer: Streamline Philly Architect: Harman Deutsch Attorney: David Orphanides, Esq., Orphanides and Toner, LLP PCPC Staff Presenter: Sarah Richardsen 6. 1 Leverington Avenue (previously heard as a Master Plan at the Jan 9, 2018 CDR meeting) Zoned: RMX-2 (Residential Multi-Family) Gross Square Footage: 246,830 square feet Uses: 63 dwelling units Parking: 138 automobile parking spaces (includes garages) Developer: D3 Development, LLC and Concordia Group, LLC Architect: Varenhorst Attorney: Dan Riesman, Eckert Seamans Cherin & Mellott, LLC PCPC Presenter: Alex Smith 7. 2500 E. Tioga Street Zoned: I-2 (Industrial) Gross Square Footage: 188,123 square feet Uses: 118 dwelling units Parking: 74 automobile parking spaces Developer: Richmond Square Associates Architect: PZS Architects Attorney: Shawn D. Ward, Esq. PCPC Staff Presenter: Jack Conviser

    April Civic Design Review
    https://www.facebook.com

About

EveryBlock collects 20 types of news in Philadelphia — including articles, real estate listings, meetups and conversations neighbors are having — and organizes it by location. Here is all the recent news and discussion near 2100-2199 N. 11th St.

Upcoming events

Fri

Mon

View full calendar →

Thousands of neighbors connect and get their news via EveryBlock, including:

Jay Ibanez Julia Goldsmith-Pinkham Creative Philadelphia Kamala Rosalie Olmedo Xu Ren Erin Catherine Hakan Ibisi Ralph Whitehead Chena Saunders

You're 60 seconds from creating an account and joining them…

or
Enter your email address